翻訳と辞書
Words near each other
・ Yavru, Amasya
・ Yavrucak, Gölbaşı
・ Yavrudoğan, Manavgat
・ Yavu, Demre
・ Yavuz
・ Yavuz Ali Pasha
・ Yavuz Ataç
・ Yavuz Bingöl
・ Yavuz Can
・ Yavuz Eraydın
・ Yavuz Karamollaoğlu
・ Yavuz Mildon
・ Yavuz Selim Mosque
・ Yavuz Selim, Etimesgut
・ Yavuz Sultan Selim
Yavuz Sultan Selim Bridge
・ Yavuz Sultan Selim Madras
・ Yavuz Sultan Selim Mosque
・ Yavuz Tatış
・ Yavuz Turgul
・ Yavuz Yapıcıoğlu
・ Yavuz Çetin
・ Yavuz Özkan
・ Yavuz Özkan (director)
・ Yavuz Özkan (footballer)
・ Yavuz Şimşek
・ Yavuz, Emirdağ
・ Yavuz-class frigate
・ Yavuzeli
・ Yavuzkemal


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Yavuz Sultan Selim Bridge : ウィキペディア英語版
Yavuz Sultan Selim Bridge

The Yavuz Sultan Selim Bridge ((トルコ語:Yavuz Sultan Selim Köprüsü)), initially named the Third Bosphorus Bridge, is a project to construct a bridge for rail and motor vehicle transit over the Bosphorus, north of two existing bridges in Istanbul, Turkey.
The bridge will be situated between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side.〔 The foundation stone laying ceremony was held on 29 May 2013.〔〔〔〔
==Project==
The bridge is part of the projected long Northern Marmara Motorway ((トルコ語:Kuzey Marmara Otoyolu)), which will bypass urban areas of Istanbul in the north connecting Kınalı, Silivri in the west and Paşaköy, Hendek in the east. The wide bridge will be in length with a main span of .〔〔 The main span of the bridge will be eighth-longest among suspension bridges in the world.
Designed by French engineer Michel Virlogeux and by Jean-François Klein from T-ingénierie (a Geneva-based company), the bridge will be a combined road-rail bridge. It will carry four motorway lanes and one railway line in each direction.〔 The construction is being carried out by a consortium of the Turkish company İçtaş and the Italian company Astaldi that won the bid on 30 May 2012. The budgeted cost of the bridge's construction is 4.5 billion (approximately US$2.5 billion as of March 2013). The construction was originally expected to be completed in 36 months with the opening date scheduled for the end of 2015.〔〔〔 On 29 May 2013, Prime Minister Erdoğan directed the construction management team to finish the construction within 24 months, and projected an opening date for May 29, 2015.〔
When completed, the Third Bosphorus Bridge will be the longest combined motorway/railway bridge in the world and the world's eighth-longest suspension bridge.〔 The bridge toll is set to be US$3.00 (approximately 6.70 as of February 2014) between the motorway exits Odayeri and Paşaköy.〔 It is expected that at least 135,000 vehicles will use the bridge daily in each direction.〔
Minister of Transport and Communication Binali Yıldırım stated that of the total area to be nationalised for the bridge project, 9.57% is currently private property, 75.24% is forested land, and the remaining 15.19% is already state-owned land.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Yavuz Sultan Selim Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.